Project: Pine Town Houses Hydro Tech has prepared and submitted a Remedial Action Plan (RAP) to the New York State Department of Environmental Conservation (NYSDEC) for the tasks associated with the UST removals. A separate RAP was prepared and submitted to the Nassau County Department of Health (NCDOH) to address the storm water drywells and floor drains at the Site. Ten drywells have been properly remediated under the direct oversight of the NCDOH and a Hydro Tech geologist. Eight (8) USTs have been removed and contaminated soil was excavated and disposed of. The excavated areas have been backfilled with clean soil allowing for the final restoration of the excavation areas. As per the NYSDEC recommendation, five (5) monitoring/recovery wells have been installed at the site and a monthly monitoring program has been instituted. |